Current transformers for the Loxone energy meters
The Loxone Energy Meters Tree do not measure current directly but via three external current transformers – one per phase. There are two meters: the Energy Meter for 40mA Current Transformers for residential and commercial buildings and the Energy Meter for 1&5A Current Transformers for larger connections in commerce and industry. Here you will find the matching Loxone split-core current transformers in sets of 3 from 25 A to 400 A.
What do I need for what?
| Item | Used for | Special feature | Price |
|---|---|---|---|
| 40mA Current Transformer 25A 10mm (3 pcs.) | Individual circuits and devices | for the Energy Meter 40mA, class 3, cable 5 m (can be shortened to 1 m) | €82.11 incl. VAT plus shipping |
| 40mA Current Transformer 100A 16mm (3 pcs.) | House connection and sub-distribution up to 100 A | for the Energy Meter 40mA, class 0.5, cable 5 m (can be shortened to 1 m) | €105.91 incl. VAT plus shipping |
| 5A Current Transformer 200A 24mm (3 pcs.) | Larger connections up to 200 A | for the Energy Meter 1&5A, class 0.5, cable 2 m | €141.61 incl. VAT plus shipping |
| 5A Current Transformer 400A 35mm (3 pcs.) | Commerce and industry up to 400 A | for the Energy Meter 1&5A, class 0.5, cable 2 m | €236.81 incl. VAT plus shipping |
| Energy Meter for 40mA Current Transformers Tree | Meter for the 40 mA transformers | MID-certified, measures consumption and feed-in | €177.31 incl. VAT plus shipping |
| Energy Meter for 1&5A Current Transformers Tree | Meter for 1 A and 5 A transformers | MID-certified, measures consumption and feed-in | €201.11 incl. VAT plus shipping |
Good to know
Transformers and meters belong together
The 40 mA transformers only work with the Energy Meter for 40mA Current Transformers, the 5 A transformers only with the Energy Meter for 1&5A Current Transformers. The two systems cannot be mixed. On the 1&5A meter you can also use 1 A or 5 A transformers from other manufacturers.
The right size
Choose the rated current to match the fuse protection of the cable you want to measure. The transformers measure accurately between 5 and 120 % of their rated current. The opening must be large enough for the conductor including insulation: 10 mm for the 25 A transformer, 16 mm for the 100 A, 24 mm for the 200 A and 35 mm for the 400 A transformer.
Mounting
The split-core transformers are clamped around the individual conductors L1, L2 and L3; the cable does not have to be disconnected for this. The colour-coded cables help with the assignment, and the direction marking shows which way round the transformer must sit. Installation in the distribution board belongs in the hands of a qualified electrician.
Frequently asked questions
Which transformer fits which meter?
The 40 mA transformers with 25 A or 100 A belong to the Energy Meter for 40mA Current Transformers Tree, the 5 A transformers with 200 A or 400 A to the Energy Meter for 1&5A Current Transformers Tree.
Why is the installation direction important?
The Loxone energy meters measure in both directions, i.e. consumption and feed-in, for example with a PV system. If a transformer is the wrong way round, the meter counts in the wrong direction on that phase. That is why every transformer has a direction marking.
Can I shorten the cables?
With the 40 mA transformers, yes: you can shorten the 5 m cables to as little as 1 m. The cables of the 5 A transformers are 2 m long and must not be shortened.
Are there always three transformers in a set?
Yes, every set contains three split-core current transformers, one for each phase.
How quickly will my order arrive?
We usually ship items in stock on the day of the order (on Mondays for orders received by approx. 11 am, Tuesdays to Fridays by approx. 2 pm); delivery within Germany takes approx. 1–3 working days. If an item is not in stock in the quantity you want, we send the rest as quickly as possible and free of charge.
Your question was not answered?Write to us – we will be happy to help.
To the contact form